PROJECTS

Case Studies

In our work with corporations, across Canada, we have completed thousands of projects since our inception in 1994.

SEARCH PROJECTS

2 & 22 St. Clair

2 & 22 St. Clair

22 ST. CLAIR AVENUE E., TORONTO, ON


Square Footage: 59,995
Market Sector: Real Estate
Architect/Designer: Gensler
Electrical Engineer: Mulvey & Banani
Mechanical Engineer: TMP Consulting Engineers
Landlord: Slate & Wittington


DownloadDOWNLOAD CASE STUDY

The St. Clair Centre is a multi-tenanted mixed-use facility. Operation and occupancy of the centre continued throughout construction. Work done on the facility included the following: Interior re-demising of the existing ground floor and concourse levels to new retail lease lines and common area layouts. Tenant mix includes existing operating retail bank, large format pharmacy and retail and food use of varying sizes up to 2,000 square foot occupancies; Interior demolition and structural slab closings to facilitate the above; New common area layout, finishes and wayfinding; Completion of landlord’s base-building tenant offerings; Associated mechanical, electrical and life safety revisions; Exterior cladding rework including the removal of existing canopy structure and the introduction of new aluminum curtainwall system and entrances; Signage and wayfinding upgrades – interior / exterior; Landscaping and sidewalk re-surfacing; Installation of new tenant elevator; Phased installation of new escalators leading to concourse while maintaining public access to the TTC; Installation of new 60-foot skylight shifted to accommodate new tenant lease lines, complete with 24 jumbo glass panels and stainless steel mullions. Structural reinforcing completed from the concourse level to roof level to support the new system along with new roof deck.

Back to list



FEATURED PROJECTS

Shaw_Office

BENSIMON BYRNE

MasterCard_Office

UNIQLO

PayPal_Office

HOLT RENFREW

Top of page